DOCUMENTS
The resources and documents published on this page are provided by the HP3A to inform current residents, prospective owners, tenants, and the public. While every effort is made to ensure the accuracy and timeliness of this information, all documents are deemed reliable but are not guaranteed. They are subject to updates or revisions without notice.
If you require certified, official copies of Association documents—such as for real estate transactions, lending compliance, or legal proceedings—please contact the HP3A directly at info@hp3a.org.
- Recorded Filing Documents
- Articles and Bylaws
- Policies
- Architectural Control
- Financial Documents
- Insurance / Utility Contracts and Deeds
- HP3a Minutes
- Communications / Newsletters
- Briargate-Stapleton Corridor
Filing 1:
- Filing 1 Plat
- Filing 1A Plat
- Filing 1B Plat
- Covenants for Filings 1, 1A, and 1B
- Covenants - Filing 1, 1A,, 1B Amendment Parking 6-12-07
- Covenants - Filing 1, 1A,, 1B Amendment Pool 6-12-07
Filing 2:
- Filing 2 Plat
- Covenants for Filing 2
- Covenants - Filing 2 Amendment Parking 6-12-07
- Covenants - Filing 2 Amendment Pool 6-12-07
Filing 3:
- Filing 3 Plat
- Filing 3A Plat
- Covenants for Filings 3
- Water Rights Decree 4-2-96
- Water Rights Decree 10-25-99
All Filings:
- Adoption and Amendment Procedures
- Alternative Dispute Resolution Policy
- Collection Policy
- Conduct of Meetings Policy and Procedure
- Conflict of Interest Policy
- Covenant and Rule Enforcement Policy
- Energy Efficiency Measures Policy
- Investment Policy
- Mailbox Policy
- Property Mowing Policy
- Records and Inspection Policy
- Reserve Policy
- Trash Policy
- USPS Mailbox Lock Change Policy and Locksmith information
- Water Meter Policy
- Water Meter Reading Admin Fee (HPA Policy, but is applicable to HP3A, as well)
Architectural Control
Highland Park 3 is a premier, covenant-protected community characterized by high-end homes and a beautiful, pastoral landscape. To preserve long-term property values and ensure the peaceful enjoyment of all residents, the Association requires the review and approval of both building and landscaping plans for all homes and vacant lots. Property owners must receive written approval from the ACC before any work commences.
Committee Members
- Christine Christiansen
- Clint Guthrie
- Mike Mohr
Plan Submittal Process
Review requirements are outlined in Section 8.C.3 of the community covenants. All submittals require both an electronic copy and a physical set of drawings:
- Electronic Submissions: Please email your digital plans and application to ACC@hp3a.org. (Note: The Board of Directors is automatically copied on all ACC correspondence).
- Physical Submissions: Please mail your required set of paper construction drawings to:
Highland Park Association 3 PO Box 64214 Colorado Springs, CO 80962
Governing Documents & Applications
Below, you will find downloadable resources to assist you with your project. Please note that certain lots within Highland Park 3 have specific design restrictions; this information is detailed directly on the community plat map.
2019
2020
2021
2022
2023
2024
2025
2026
Board of Director Minutes
2018
2019
2020
2021
- BOD Minutes 2-9-2021
- BOD Minutes 4-20-2021
- BOD Minutes 6-21-2021
- BOD Minutes 10-22-2021
- BOD Minutes 12-13-2021
2022
- BOD Minutes 2-22-2022
- BOD Minutes 4-19-2022
- BOD Minutes 6-14-2022
- BOD Minutes 8-30-2022
- BOD Minutes 10-4-2022
2023
2024
2025
2026
Membership Meeting Minutes
2020
2021
2022
2023
2024
2025
2026
